Interreg Europe · Co-funded by the European UnionABCDEX

The data exchange of the ABC Interreg project

For contractors

Find proven biobased build-ups with EPD, fire class, lead-time, and the subsidy that paid for the last one.

Policy benefits filtered to construction contractors — tender bonuses, mandatory-inclusion thresholds, and the financing instruments that de-risk biobased build-ups.

6 matching benefits

PolicyBenefitConcrete valueEligibilityWhat to doDeadline
Paris Climate Agreement
EU-wide
Tender score bonus

[PLACEHOLDER — partner curator review pending] Klimaatakkoord-linked public procurement increasingly attaches a biobased / circular bonus weight in tender scoring. Contractors who specify documented biobased materials win evaluation points.

Variable by aanbestedende dienstAny contractor tendering on a procuring authority that has adopted the bonus weight.Map each tender's MVI (Maatschappelijk Verantwoord Inkopen) criteria; document biobased share + EPDs at submission.ongoing
Environmental Performance Calculation (part of building permit)
Other scope
Tender score bonus

Contractors using biobased materials can demonstrate significantly lower environmental impact scores in the mandatory milieuprestatieberekening, improving permit prospects and competitive positioning.

18–35% lower environmental impact for biobased buildings, plus additional 10–25% from biogenic carbon storageContractors and architects building in the Netherlands who use biobased materials with registered NMD data.Use biobased materials with verified NMD data entries and include biogenic carbon storage values in environmental performance calculations.ongoing
National Approach Bio-based Building
Other scope
Mandatory inclusion

[PLACEHOLDER — partner curator review pending] MPG (Milieuprestatie Gebouwen) threshold trajectory under NABB ratchets down each year — favouring contractors who can deliver biobased build-ups under the new ceiling rather than retrofitting later.

MPG threshold tightening (indicative)All Wabo-permitted new residential construction in NL above the size threshold.Verify MPG calculation under current Bepalingsmethode before tender submission; route biobased materials with low A1–A3 GWP into the design.ongoing
National Approach Bio-based Building
Other scope
Knowledge / advisory access

[PLACEHOLDER — partner curator review pending] National Approach Biobased Construction (NABB) — convening platform giving contractors access to lead clients, pilot programmes, and the biobased value-chain consortia where new build-ups get specified first.

Free participationOpen to construction firms with demonstrable biobased pilot intent.Register interest through the NABB platform; align with one of the consortium workstreams.ongoing
France Extended Producer Responsibility for Construction and Demolition Waste
Other scope
Other

France's extended producer responsibility scheme for construction and demolition waste creates regulatory obligations that drive circular material management practices in construction.

not statedongoing
Netherlands Target to Halve Primary Material Use in Construction by 2030
Other scope
Other

Dutch government targets halving primary material use by 2030 and net-zero circular economy by 2050; urban mining study projects up to 40% GHG reduction in construction sector by 2050.

Target: 40% GHG reduction by 2050 via decarbonisation and urban miningongoing

Placeholder rows · partner-curator review pending. Every row is a claim that needs a source. Regional Curators (Christina/IT, NL/LV/RO/SL/EL partners) confirm each benefit (concrete value, eligibility, action) before it loses the placeholder flag. Submit corrections via /contribute once that flow ships in Step 9.